The Kudos International Project

The Brighton Centre is a world renowned Conference and Concert Venue and hosts high profile events such as Political Party Conferences, Indoor Sporting Events and large music concerts.

GPT were asked to review the waste provision at the site following continual issues with service, poor recycling rates of less than 30% and a general lack of management information.

A full site review was undertaken and various waste streams identified. Recommendations were then made to the Site Manager to improve service, reduce costs and increase recycling rates.

The Challenges

Recommendations were made to implement a dedicated Food Waste Solution, along with the consignment of other waste as Mixed Recylables and a dedicated Glass Waste service.

This would produce a solution achieving a 100% diversion from landfill for the site. However, it was felt that an immediate change to this waste service provision would have proved logistically difficult therefore a service provision was implemented to allow for Dry Mixed Recyclables and General Mixed Waste.

A Materials Recycling Facility (MRF) has been sourced enabling all the General Mixed Waste from the venue to be subjected to a recycling programme ensuring that the maximum amount of waste is recycled.

This has resulted in an overall recycling rate for the site of over 98%, which is a significant increase on the 30% rate being reported by the previous supplier. In addition, regular monthly recycling reports are provided to the client detailing the weights of waste collected from site and the recycling rates achieved.

Services & Products

8yrd REL for GMW

1100Ltr Wheelie Bins for Dry Mixed Recyclables

Food waste

Glass waste

Hazardous waste

Washroom waste

Wheelie bins

General waste

Liquid waste

Recycling systems

Ready, Set, Recycle

Not sure which services you require? Book a waste management assessment today

waste-recycle-process